Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 005 1 Page 3 of 3 <br />Haul Rnute- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />T1 <br />(Ft) <br />( %) <br />(%) <br />(fpm) <br />Time <br />10.387 <br />3.00 <br />2874 <br />min <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />3 Truck(s) <br />Haul Time: 0.387 minutes <br />Rehirn Rnnte- I <br />I <br />r <br />i <br />i <br />I <br />i <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />T1 <br />Loading Tool unit <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />I <br />r <br />i <br />i <br />I <br />i <br />CIRCES Cost Estimating Software <br />Return Time: 0.307 <br />minutes <br />Total Truck Cycle Time: } 3.378 <br />minutes <br />Loading Tool unit <br />Production <br />314.89 <br />LCY/Hour Adjusted for job efficiency: <br />261.36 LCY/Hour <br />Truck Unit Production <br />175.62 <br />LCY/Hour Adjusted for job efficiency: <br />145.77 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 437.30 <br />LCY /Hour <br />Adjusted single truck/loader team production: 261.36 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 261.36 <br />LCY/Hour <br />JOB TIME AND COST <br />A <br />_ <br />Fleet size: <br />1 <br />Team(s) Total job time: 8.80 <br />Hours <br />Unit cost: <br />$2.978 <br />/LCY Total job cost: $6,849 <br />1 <br />j <br />i <br />I <br />r <br />i <br />i <br />I <br />i <br />CIRCES Cost Estimating Software <br />