Laserfiche WebLink
r <br />Page 1 of 3 <br />TRUCK /LOADER TEAM WORK <br />r <br />1 <br />Task description Remove Coal Fines from Stockpile and Place in Fill <br />Site: Fruita Loadout Permit Action: MT1 Permit/Job #: C2010088 <br />PROJECT IDENTIFICATIOI\ <br />Task #: 005 <br />Date: 8/26/2014 <br />User: ZTT <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />- Loader: <br />Support Equipment -Load Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Abbreviation: None <br />Filename: C088 -005 <br />Shift basis: leer day <br />Generic 8 -10 cy, 6x4 <br />Cat 336D L 10' -6" Stick <br />NA <br />Cat D9T - 9SU <br />CAT 12M <br />Water Tanker, 5,000 Gal. <br />Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 2,300 CCY Swell factor: 1.000 <br />Loose volume: 2,300 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 16 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds /LCY <br />Description: Coal - Bituminous, Raw <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 17.05 LCY <br />C[RCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />i 100 <br />50 <br />100 <br />Ownership cost/hour: <br />$9.39 <br />$38.17 <br />NA <br />! $72.57 <br />$24.98 <br />$20.53 <br />Operating cost/hour: <br />$50.50 <br />$87.89 <br />NA <br />$142.41 <br />$23.17 <br />$47.40 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.83 <br />NA <br />$38.85 <br />$38.23 <br />$25.61 <br />Unit Subtotals: <br />$59.89 <br />$164.89 <br />NA <br />$253.83 <br />$86.38 <br />$93.55 <br />Number of Units: <br />3 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $344.56 <br />Support: $253.83 <br />Maint: $179.93 <br />Total work team cost/hour: $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 2,300 CCY Swell factor: 1.000 <br />Loose volume: 2,300 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 16 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds /LCY <br />Description: Coal - Bituminous, Raw <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 17.05 LCY <br />C[RCES Cost Estimating Software <br />