Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 004 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />252.03 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1000.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.458 <br />Haul Time: ' 0.458 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />252.03 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />1000.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.376 <br />CIRCES Cost Estimating Software <br />Return Time: 0.376 <br />minutes <br />Total Truck Cycle Time:' 3.197 <br />minutes <br />Loading Tool unit <br />Production <br />303.65 <br />LCY/Hour Adjusted for job efficiency: <br />252.03 LCY/Hour <br />Truck Unit Production <br />148.45 <br />LCY/Hour Adjusted for job efficiency: <br />123.21 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 369.64 <br />LCY /Hour <br />Adjusted single truck/loader team production: 252.03 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 252.03 <br />LCY /Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 69.34 <br />Hours <br />Unit cost: <br />$3.088 <br />/LCY Total job cost: $53,967 <br />E <br />CIRCES Cost Estimating Software <br />