My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-09_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2015-04-09_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:50 PM
Creation date
4/14/2015 2:23:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
4/9/2015
Doc Name
Response To Adequacy Review for AM03
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/29/2004 <br />!��_..,,... Notes For 3 :I0:27PM <br />T I D E M A R K Case #: ROW2004 -00133 <br />COMPUTER SYSTEMS. INC. <br />3/29/2004 GCS 311/2004 -Issued permitto open cutthe roadway at this location forwaterline crossings. <br />3/16/2004 -Met withGrahamMayof Scott Contracting to discussroad closureissues and various other construction <br />issues. It is anticipated that road closures will be posted Saturday 3/20/2004 andexcavation willbegin on Sunday <br />3/21/2004. <br />3122/2004 - Excavation is underway as per the submitted plan. <br />323/2004 - Excavation and dewatering continues as per the submitted plan. <br />324/2004 - Excavation is complete and dewatering continues. Initial pipe placement began. Approximately 300 C.Y. of <br />3000psi concrete will be placed to scitle the pipe. <br />32512004 -Pipe placement and concrete work have been completed. Backfill operations have begun with a structural clay <br />backfillmaterial. <br />326/2004 - Backfill placement has been completed. A proof roll was completed under my observation. The proof roll was <br />approved and I granted approval for paving. A full depth 9 "section will be placed atthis location, using two lifts of "G" <br />mix, toped with a 2" lift of la" "SX" Paving material. The existing asphaltwill be milled for a distance of 69 both north <br />and south of the cutto provide for a 2" overlap on the out <br />329/2004 -Paving has been completed and striping is also complete. Took final photographs. Close permit <br />I of I CaseNote&apt <br />
The URL can be used to link to this page
Your browser does not support the video tag.