My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-09_REVISION - M1980183
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980183
>
2015-04-09_REVISION - M1980183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:50 PM
Creation date
4/14/2015 2:23:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980183
IBM Index Class Name
REVISION
Doc Date
4/9/2015
Doc Name
Response To Adequacy Review for AM03
From
Applegate Group, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gordon Stevens <br />Subject: <br />Scott Contracting, ROW2004 -00133 <br />Start Date: <br />Monday, March 01, 2004 <br />Due Date: <br />Friday, July 29, 2005 <br />Status: <br />In Progress <br />Percent Complete: <br />0% <br />Total Work: <br />0 hours <br />Actual Work: <br />0 hours <br />Owner: Gordon Stevens <br />Permit Loc.: 132nd Ave. & Old Brighton Rd. <br />311/2004 - Issued permit to open cut the roadway at this location for waterline crossings. <br />3/16/2004 - Met with Graham May of Scott Contracting to discuss road closure issues and various other construction issues. It is <br />anticipated that road closures will be posted Saturday 3/2012004 and excavation wilLbegin on Sunday 3/21/2004. <br />3/22/2004 - Excavation is underway as per the submitted plan. <br />3/23/2004 - Excavation and dewatering continues as per the submitted plan. <br />3/2412004 - Excavation is complete and dewatering continues. Initial pipe placement began. Approximately 300 C.Y. of 3000psi <br />concrete will be placed to settle the pipe. <br />3/25/2004 - Pipe placement and concrete work have been completed. Backfill operations have begun with a structural clay backfill. <br />material. <br />3/26/2004 - Backfill placement has been completed. A proof roll was completed under my observation. The proof roll was approved <br />and I granted approval for paving. A full depth 9" section will be placed at this location, using two lifts of "G" mix, toped with a 2" lift <br />of 1/2" "SX" Paving material. The existing asphalt will be milled for a distance of 60' both north and south of the cut to provide for a <br />2" overlap on the cut. <br />3/2912004 - Paving has been completed and striping is also complete. Took final photographs. Close permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.