CRIPPLE CREEK & VICTOR GOLD MINING Co. a <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />whee(e <br />road between approximately stations L6 +00 and L10 +00, Squaw Gulch between approximately <br />stations L6 +00 and L10 +00, and in the vicinity of the PSSA toe berm. <br />A Cat 330 excavator with attached rock hammer was used to breakup oversized Structural Fill <br />material. <br />The Structural Fill material was placed and compacted per the project specifications. <br />One JD 670G excavator rough graded the Phase 2 slopes upslope of approximately stations <br />M30 +00 through M38 +00. <br />GPS equipped D6 dozers finish graded the slopes downslope of access road stations 86 +00 <br />through 88 +00, the slopes upslope of stations L8 +00 and L10 +00, and the PSSA toe berm /ADR <br />access ramp <br />One dozer rough graded the slopes in the general vicinity between stations H28 +00 and J10 --00. <br />Subgrade: <br />The following Phase 1 subgrade area was compacted per project technical specifications to <br />finished grade, inspected, and certified for SLF placement: <br />'r Between approximate stations A2 +00 to Al2 +00 and C2 +00 to C12 +00. <br />See attachment for the subgrade acceptance map for all accepted subgrade locations. <br />Soil Liner Fill: <br />Soil Liner Fill (SLF) processing continued periodically at the Cameron Site. <br />Began the haul and placement of the SLF material at the end of the reporting period. One <br />excavator loaded multiple Cat 740 haul trucks with the SLF material from the Midway stockpile. <br />The material was placed on the A bench (9,450 elevation) between approximately stations A2 +00 <br />through Al2 +00. The SLF was spread in a horizontal lift using one Cat D6 dozer. The material <br />was not being placed as an engineered compacted SLF at this point in time but rather being <br />stockpiled along the bench for future placement and compaction on the slope above the A bench. <br />Spent Ore: <br />Front -end loaders loaded Cat 740 haul trucks with previously stockpiled Spent Ore from the east <br />quadrant of the PSSA. The material was hauled approximately 800' south within the PSSA <br />footprint and spread with Cat Dozers in an approximately 20' lift to finish the 150' horizontal <br />distance north and east of the HVSCS riser pipes on the ADR2 platform. <br />A GPS equipped D6 dozer finish graded the area north of the PSSA's High Volume Solution <br />Collection System riser pipes. <br />One Cat D6 dozer graded an area in the vicinity of the east quadrant of the PSSA for a future <br />LLDPE liner laydown yard. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />