Laserfiche WebLink
March 26, 2015 C- 1981 - 022 /Elk Creek Mine RAR <br />Photo 3: Pond B Photo 3a: Ditch D3 Lower <br />The observed ditches and culverts were in stable conditions. No issues were noted with ditches or culverts, with the <br />exception of the following: <br />• Currently there is a mine pipe at Power Line Road as shown in Photo 4 conveying cables. This should be removed. Ditch D3 <br />Lower is somewhat compromised in a couple of areas from Powerline Road to the Washbay and Oil Storage area due to <br />gravel that was deposited. Some ditch maintenance is needed along here to maintain function. These items should be <br />addressed by the next ground inspection. Photo 4. <br />• Debris and equipment in Ditch D9 (clean water ditch) will require removal. The top of the ditch surface requires leveling to <br />ensure function and approved design is maintained. This should be addressed by next ground inspection. Photo 5. <br />Photo 4: Culvert-DBa across Power Line Road. Photo 5: Debris in Ditch D9. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 6 <br />