Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. I A7 <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />II) Laboratory Activities: <br />Atterberg limits, moisture, laboratory compaction, and sieve analysis laboratory testing continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 22 -1 through SO 40 -1 (information only <br />General Protect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held March 18, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />r Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />l <br />Submitted by: Mike Moore Date: March 24, 2015 <br />Reviewed by: Date: <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: _? -_ 2 y- /'5 <br />Date: 3 - a..Y / r <br />