Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec +� <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; SO /LVSCF mix, SLF, and SF sampling; underground working <br />remediation; and monitoring SO placement in the PSSA. <br />11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 15 -1 through SO 21 -1 (information only) <br />Soil Liner Fill SLF -174 -C and SLF -175 -C (Control Samples) <br />Structural Fill SF -124 -R and SF -125 -R (Record Samples) <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held March 11, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by E Lorenson Date: March 16, 2015 <br />i <br />Reviewed by: <br />Mike Moore <br />Date: March 16, 2015 <br />- <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: 3, 7_7 - 15 <br />Date: 3 -17- I- <br />