My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-02_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-04-02_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:59 PM
Creation date
4/3/2015 8:46:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/2/2015
Doc Name
CQA Report - Weeks ending 3/7/15, 3/14/15, 3/21/15
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec +� <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; SO /LVSCF mix, SLF, and SF sampling; underground working <br />remediation; and monitoring SO placement in the PSSA. <br />11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 15 -1 through SO 21 -1 (information only) <br />Soil Liner Fill SLF -174 -C and SLF -175 -C (Control Samples) <br />Structural Fill SF -124 -R and SF -125 -R (Record Samples) <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held March 11, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by E Lorenson Date: March 16, 2015 <br />i <br />Reviewed by: <br />Mike Moore <br />Date: March 16, 2015 <br />- <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: 3, 7_7 - 15 <br />Date: 3 -17- I- <br />
The URL can be used to link to this page
Your browser does not support the video tag.