Laserfiche WebLink
• Pull back 2' and start grout pour. Cement from top of sand to surface <br />with 13 pound per gallon neat cement. Mix and pump - 1630 gallons <br />(120 sacks) in 6 stages. Pull 10 joints of tremie at each stage. <br />• Cement did not come to surface. <br />• Install temporary plug and valve in tubing. <br />• Estimated flow from overburden zone 1 gpm. <br />October 27 <br />• Tag cement at 20'. Fill to surface. <br />October 28 <br />• Welder constructing wellhead and riser assembly. Install. <br />• Leave valve open, allowing well to flow and clean up. Measured flow <br />1.2 gpm. <br />November 17 <br />• Flow testing well. Measured flow 1.5 gpm, shut -in pressure 47 psi. <br />