Laserfiche WebLink
NOTE; Calculations for 1.7 pails of pellets and 1/2 sack of sand show <br />a fill length of approximately 6.4' of 6-1/4" hole. The tremie string was <br />plugged when the driller started circulation before cementing. It cleared, <br />but the bottom 3 sets of opcnings in the stinger were plugged when it <br />came out of the hole. This suggests that nearly the entire seal was <br />penetrated by the stinger and that the top of the bentonite and sand was <br />at approx. 119 1'. <br />November 4 <br />• Re -fill cement to surface. Install wellhead assembly and riser. <br />Artesian flow trickling from the wellhead. <br />November 17 <br />• Flow testing well. Measured flow 0.02 gpm (1 /z gallon in 25 minutes), <br />shut -in pressure 45 psi. <br />