My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-02_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2015-04-02_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:00 PM
Creation date
4/2/2015 12:45:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
4/2/2015
Doc Name
Adequacy Review No. 1 Responses
From
Tri State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR8
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI -STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233 -0695 303 - 452 -6111 <br />April 3, 2015 <br />Mr. Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Horizon North Mine (C- 2010 -089) <br />Technical Revision No. 8 (TR -08) <br />Adequacy Review No. 1 Responses <br />Dear Mr. Bowles: <br />`410 <br />PQ� e 5a <br />Tri -State Generation and Transmission Association, Inc. (Tri- State) has received your <br />adequacy review letter for TR -08, dated December 26, 2014 and provides the following <br />responses on behalf of Western Fuels- Colorado, A Limited Liability Company (WFC) New <br />Horizon North Mine. <br />It appears that what is now being termed the "Southeast Coal Haul Road" is actually the <br />first 1000 feet of the eastern end of the approved West Haul Road. This change in <br />nomenclature is confusing and creates a challenge in comparing the as -built road with <br />the approved design. There is no "Southeast Coal Haul Road" on the approved map. <br />Please update all the text and maps so the nomenclature is consistent. <br />Response: The nomenclature on the maps and text in Appendix 2.05.3(3) -3 has been <br />changed to indicate West Haul Road rather than Southeast Haul Road. Also, the text in <br />Section 2.05.3(3) has been updated to indicate the names of the haul roads as the East <br />Haul Road, the West Haul Road, and the Northwest Haul Road which is consistent with <br />the information shown on approved Map 2.05.3(3) -3. <br />2. The table on permit Map 2.05.3(3) -3 shows that the width of haul roads will vary <br />between 40 and 50 feet. Cross sections provided on proposed Map 2.05.3(3) -4 show that <br />the roadway was constructed to a width of approximately 30 feet. Please explain why the <br />proposed haul road was not designed and built to the approved haul road standard <br />outlined on Map 2.05.3(3) -3. <br />Response: The table on Map 2.05.3(3) -3 represents the proposed maximum design for <br />the haul roads. However, the full maximum design width was not needed in the field. <br />Therefore, the West Haul Road (Section 0 +00 to 10 +52) was constructed to a reduced <br />width of 30 -40 feet, as depicted on Map 2.05.3(3) -4. <br />AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER CRAIG STATION ESCALANTE STATION NUCLA STATION <br />y P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />A Touchstone Energy' Cooperative 7d CRAIG, CO 81626 -1307 PREWITT, NM 87045 NUCLA, CO 81424 -0698 <br />970- 824 -4411 505- 972 -5200 970- 864 -7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.