My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-01_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2015-04-01_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:50 PM
Creation date
4/1/2015 12:26:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
4/1/2015
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
3/24/2015
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 24, 2015 C- 1996 - 083 /13owie No. 2 Mine JDM <br />a <br />0 1 hhq -Amos <br />Terror Creek Vent Shaft Rock Drain Small Erosion Gully on the Outside of the Rock <br />As noted in the October 2014 coal complete inspection, ditch D -1337 is designed to flow south along the conveyor <br />line between culverts C -1326 and C -1313. Culvert C -1313 then conveys the D -1337 flow to B- Gulch. Due to down - <br />cutting of D -1337 the operator cut a new ditch to carry flow from D -1337 to B -Gulch on the west side of the <br />conveyor, rather than realigning D -1337 to C -1313. BRL must maintain D -1337 as designed and remove the ditch <br />carrying flow under the conveyor line, or submit revised designs consistent with the current on- the - ground <br />configuration. <br />PROCESSING WASTE /COAL MINE WASTE PILES — Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Gob Pile # 1 <br />Gob Pile #1 has been inactive. Technical Revision No. 97 is currently under review to provide a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1 <br />Gob Pile #2 <br />During the inspection equipment was in the process of rehandling the dried, windrowed material and placing the <br />material to the west of the pile to be compacted on bench #4. <br />Placed Refuse and Comp, <br />ctinR at Gob Pile #4 Bench 4 <br />Number of Partial Inspection this Fiscal Year: 11 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 5 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.