My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-31_HYDROLOGY - M1999050
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1999050
>
2015-03-31_HYDROLOGY - M1999050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 1:48:06 PM
Creation date
4/1/2015 9:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999050
IBM Index Class Name
HYDROLOGY
Doc Date
3/31/2015
Doc Name Note
April 1, 2015 through March 31, 2016
Doc Name
Substitute Water Supply Plan April 1, 2015 through March 31, 2016
From
DNR Water Resources
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv. The well meter serial readings for each meter shall be included if <br />there is more than one meter on a well. <br />b. Each recharge site must comply with the Administration Protocol - <br />Recharge and must report the: <br />L daily volume in AF diverted into the site; <br />ii. monthly volume in AF released from the site; <br />iii. monthly net evaporative loss in AF; <br />iv. volume of water in AF remaining at the end of the month. <br />c. The accounting must identify each source of fully consumable <br />replacement water actually delivered to the location impacted by the <br />depletions. To demonstrate the water was actually delivered to the <br />required location will require the following information: <br />i. the originating source of the water, date released and volume of <br />water released; <br />ii. transportation losses to point of diversion or use, if any, using <br />stream loss factors approved by the water commissioner; <br />iii. the volume of water actually delivered on a daily basis past any <br />surface water diversion that was sweeping the river as <br />corroborated by the water commissioner. <br />(See Administration Protocol — Delivery of Water for more details <br />on delivering water.) <br />d. For each source of replacement water that has been "changed" for <br />use as a source of augmentation, such as changed reservoir shares, <br />ditch bypass credits or credits from dry-up, etc., the following input <br />information must be reported: <br />i. the basis and volume of the return flow obligation; <br />ii. the location the changed water was historically used; this will be <br />the location used to determine the timing of the return flow impact <br />on the river. <br />4. The accounting must include a monthly projection of the plan's operation at <br />least through March 31 of the next calendar year. <br />5. The accounting must include all input and output files associated with modeling <br />the delayed impact of diversions. The output from the modeling must report to <br />a summary table that shows, by month, the ongoing depletions associated with <br />pumping, return flow obligations, etc. and accretions from recharge operations. <br />6. A net impact summary must show the out -of- priority depletions, accretions from <br />each recharge site, volume of replacement water actually delivered to the <br />location of the depletions and the resultant net impact on a daily basis. If <br />necessary, the net impact must be done by river reach. <br />While modeling may use a monthly step function to determine the depletions <br />from pumping and accretions from recharge, the monthly result must then be <br />divided by the number of days in the month in order to simulate a daily <br />impact, as water rights are administered on a daily and not monthly basis. <br />Administration Protocol - Augmentation Plan Accounting <br />Revised March 19, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.