Laserfiche WebLink
JB Construction <br />789 CR 120 <br />Hesperus, CO. 81326 <br />BIII To <br />Cliff and Carolyn Attkisson <br />Ship To <br />Invoice <br />Date Invoice No. <br />05/12/11 39 <br />Due Date <br />Rep <br />Project <br />05/12/11 <br />Item <br />Description <br />Qty <br />Rate <br />Amount <br />Excavation <br />dig out culvert, deepen ditch on east side <br />4 <br />83.00 <br />332.00 <br />Installation <br />re- install culvert with mouths, concrete k -rails and <br />8 <br />83.00 <br />664.00 <br />necessary boulders <br />Backfill <br />process roadbase, backfill & compact culvert <br />6 <br />83.00 <br />498.00 <br />Final Grade <br />grade and compact road over culvert <br />8 <br />83.00 <br />664.00 <br />Materials <br />2 loads 3/4 road base <br />472.00 <br />472.00 <br />Materials <br />2 collars and mouths for existing culvert <br />463.80 <br />463.80 <br />Materials <br />2 81t concrete k- rails, with delvery and placement <br />749.85 <br />749.85 <br />Fuel <br />est cost of diesel at $4 per gal, est 30 gals <br />120.00 <br />120.00 <br />Deposit <br />deposit <br />- 2,000,00 <br />Total $1,963.65 <br />