Laserfiche WebLink
Letting of 11/13/2014 <br />CDOT Bid Download Report by Bid Amount <br />+--------------------------------------+---------------------------------- - - - - -+ <br />Contractor's Name <br />Kirkland Construction, L.L.L.P. <br />COLORADO DEPARTMENT OF TRANSPORTATION +----------- -- ---- --------- -------- - - - - -+ <br />1CONTRACTOR'S PROPOSAL j Contractor's code number: 160A <br />+-------------- -------------------- - - - - -+ <br />Prequal. expiration date: 10/31/15 1 <br />- - - - - -+ <br />Proposal for Project No.(s) STA 009A -034 <br />---------------------+---------------------------------- - - - - -+ <br />I, the undersigned bidder for the project(s) listed above, hereby offer this <br />proposal to the Chief Engineer, Department of Transportation, 4201 East Arkansas <br />Ave., Denver CO 80222. <br />I UNDERSTAND the bidding and award for this project(s) shall be in accordance <br />with the rules that implement the "Construction Bidding for Public Projects Act" <br />Sections 24 -92 -101 et seq., C.R.S. <br />I FURTHER UNDERSTAND that if this proposal is accepted, the Invitation for Bids, <br />Proposal, Plans, Standard Specifications, Supplemental Specifications, Special <br />Provisions, Contract Form, and Contract Bonds shall be part of the complete <br />contract. <br />I FURTHER UNDERSTAND that failure to include this Form #85 in the proposal will <br />cause this proposal to be rejected. <br />IN PREPARING THIS PROPOSAL, I HAVE: <br />- examined the Plans, Specifications, and the site of the proposed <br />project and I am satisfied as to the conditions to be met and the work <br />to be accomplished. <br />- considered any revisions to the Plans and Specifications which were <br />made after advertisement. Number of revisions: 5 <br />IF THIS PROPOSAL IS ACCEPTED AND I AM AWARDED THE CONTRACT, I AGREE TO: <br />- execute a Contract and Bonds on forms provided by the Department of <br />Transportation within 15 calendar days after the date of award. I under- <br />stand that failure to do so will be just cause for cancellation of the <br />award and forfeiture of the proposal guarantee. <br />- commence work within 20 calendar days (or other time as specified in <br />the Notice to Proceed) after the award date. I will complete the work in <br />accordance with the time stated in the project Specifications. <br />- accomplish the work on the project in accordance with the Plans and <br />Specifications, under the direction and according to the instructions of <br />the Chief Engineer or, authorized representative, at the unit prices <br />named in this proposal. <br />- perform any increased or decreased quantities of work at the unit <br />prices named in the Proposal, except for alterations as provided for in <br />the Specifications. I understand the Bid Schedule of quantities shown in <br />this proposal is approximate and subject to change and that the Depart- <br />ment may, in its sole discretion, unilaterally increase the funds avail- <br />able under the Contract if the quantities increase. <br />EXHW i of Z& <br />('nnT rage 3 ui Du <br />