My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-09_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2015-03-09_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:08 PM
Creation date
3/24/2015 2:28:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/9/2015
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K11 <br />Mine. Exhibit 40 Jansen Load out contains a detailed description of all facilities and <br />associated modifications related to the load out facility. In general, a retaining wall, <br />truck weight station, feed hopper, conveyor belt, and load out bin will be constructed. <br />This load out facility will be temporary and will be used in an interim period until <br />NECC can complete construction of the railroad to the mine. It is anticipated that <br />this temporary load out facility would be used until 2012. <br />(4) Ponds, Impoundments and Diversions <br />The Sediment and Surface Water Control Plans are shown on Maps 13 and 14 for the <br />East Portal and West Portal respectively. The Operator submitted these plans as a <br />technical revision to the permit. These revisions have been necessary because of <br />preparation plant construction; refuse area construction, and the need for more <br />efficient routing of disturbed water as well as ease of maintenance of the overall <br />drainage system. The area north of Ditches D11, and D19 to the Highway 12 <br />easement were graded, covered with subsoil and topsoil, mulched and seeded during <br />August and September of 1990. <br />The Operator has three sediment ponds, which collect surface disturbance runoff <br />from the East Portal area. These ponds are 004, 007 and 008. A fourth pond, pond <br />005, was reclaimed in 2003, as the area serviced by this pond was never used for <br />mining related activities. These sedimentation ponds and associated diversion ditches <br />have been designed according to Section 4.05.6 of the DRMS Regulations. In <br />addition, the diversion structures have been designed utilizing the requirements of <br />4.05.3 and 4.05.4. Typical sections of the emergency spillways and embankments of <br />each sediment control structure are shown in Figure 3, Typical Embankment Cross <br />Section. Typical diversion sections are provided on Map 13 Sediment and Surface <br />Water Control Plan- East Portal. Table 20, Ditch Data, is a summary of the diversion <br />(ditch) data relating to Map 13. Table 21, Culvert Sizing and Figure 23, Culvert <br />Sizing Nomograph, provide backup for culvert sizing as per requested drainage <br />modifications. Table 23, Sediment Pond Dimensions, is a summary of sediment pond <br />dimensions. <br />The Operator will control West Portal drainage using ditches, containment areas and <br />bypass culverts. All structures are shown on Map 14, Sediment and Surface Water <br />Control Plan -West Portal. Calculations are found in Exhibit 19, Sediment Design <br />Specifications. <br />Runoff from the DWDA #3 is routed through a series of diversion ditches and will be <br />routed to Containment Area No. 2. The sedimentation control plan for the DWDA <br />#3 is contained in Exhibit 19(22) and was evaluated based on the 100 -year, 24 -hour <br />event. Runoff from the undisturbed upland areas to the west are diverted around the <br />pile in ditch D49. Runoff from a small - undisturbed upland area east of the pile is <br />routed through the diversion ditches and routed to containment area 2. <br />Ditches 27 and 69 will direct runoff to Containment Area 2. Containment Area 2 has <br />been designed to contain the 25 -year, 24 -hour event, per Rule 4.05.9(2)(e) and as <br />Section 2.05 TR -70 03/02/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.