Laserfiche WebLink
19 <br />Light Use Road Drainage <br />The Bates Portal light use road is designed, and shall be maintained to have adequate <br />drainage, using ditches and culverts. The water control system is designed to safely <br />pass peak runoff from a 10 -year, 24- hour precipitation event. The drainage design <br />for the Bates Portal light use road is shown on Map 13a. <br />Drainage design for the 0.2 mile long light use road that provides access to slurry <br />wells S2 and S3 is shown on Map 14. Drainage designs for the RDA light use roads <br />that provide access to the cell repeater are shown on Map 13. <br />No surfacing will be utilized for the light use roads. The light use roads will be <br />maintained adequate for the intended use of the roads. A light use road damaged by <br />a catastrophic event will be repaired as soon as is practicable after the damage has <br />occurred. <br />Light Use Road Reclamation <br />Light use roads will be reclaimed. <br />The Bates Portal light use road will be reclaimed in conjunction with the reclamation <br />and backfilling of the Bates Portal. <br />The temporary light use road located in the lower reaches of the RDA #1 expansion <br />area will be reclaimed following its use. Test pits will be backfilled and returned to <br />AOC. The area will be seeded and mulched. <br />RDA Feed Belt for Development Waste Rock <br />This beltline transfers development waste up to the existing RDA beltline and to the RDA <br />(Refuse Disposal Area). This belt will be removed and the surface reclaimed when the <br />beltline is removed from service. <br />This Belt System consists of bolt together structure mounted on stands. At locations where <br />the beltline crosses a drainage system; the belt structure will be suspended from cables that <br />are anchored on either side of the drainage system. The belt will have spillage containment <br />devices to prevent any spillage from entering/contaminating any drainage not reporting to <br />Pond 07. <br />The belt line will run from east to west starting at the RDA belt and set <br />approximately parallel to and south of Highway 12 and north of the Purgatoire River. <br />(d) Remote Rail Load out at Jansen <br />NECC will use the existing Jansen industrial site located approximately one mile <br />southwest of Trinidad Colorado as a temporary coal load out facility for New Elk <br />Section 2.05 TR -70 03/02/2015 <br />