Laserfiche WebLink
Introduction <br />i� a&wd emewcam, .4d;v has developed this SPCC Plan to establish standard operation procedures and <br />the necessary employee training to minimize the likelihood of accidental release of pollutants that can <br />contaminate the stormwater. <br />Spill Prevention and Response Training <br />Prior to start up, kcal wd eowawe&o, 444;4 personnel have been trained in the following spill control <br />procedures by the Erosion Control Supervisor: <br />• Spill control <br />• Containment, vessel, tank, an piping inspection and maintenance; <br />• Spill response, containment, and clean up; <br />• Company policies on reporting and responding to spills <br />Environmentally Sensitive Areas: <br />The following areas have been identified as being environmentally sensitive: <br />No sensitive areas have been identified. <br />1. Identification of the spill clean up coordinators : <br />All responsible personnel and their corresponding contact information are presented below: <br />SPCC Plan Contacts <br />Responsibility <br />Name <br />Phone Number <br />Spill Coordinator <br />Tim Provost <br />719 - 251 -6937 <br />Project Supervisor <br />Joe Provost <br />719 - 251 -6918 <br />Erosion Control Supervisor <br />Shanon Conley <br />719 - 243 -5750 <br />