Laserfiche WebLink
Blue Valley Pit Adequacy Letter <br />Page 3 of 3 <br />March 19, 2015 <br />13. Per Rule 6.3.5(2)(c), please update Exhibit E — Mining Plan Map to indicate the location of the <br />processing plant, concrete batch plant and asphalt batch plant, as needed. <br />14. Per Rule 6.3.5(3)(d), please update Exhibit E — Reclamation Plan Map to state the average <br />thickness of the replaced overburden. <br />15. Per Rule 6.3.5(3)(e), please update Exhibit E — Reclamation Plan Map to state the average <br />thickness of the replaced topsoil. <br />6.3.9 Exhibit I — Proof of Filing with County Clerk <br />16. Please provided an affidavit or receipt indicating the date on which the revised application <br />information required to address this adequacy letter was placed with the Grand County Clerk <br />and Recorder for public review, pursuant to Subparagraph 1.6.2(1)(c). <br />Please be advised the Blue Valley Pit application may be deemed inadequate, and the application <br />may be denied on March 26, 2015, unless the above mentioned adequacy review items are <br />addressed to the satisfaction of the Division. If more time is needed to complete the reply, the <br />Division can grant an extension to the decision date. This will be done upon receipt of a written <br />waiver of the Applicant's right to a decision by March 26, 2015 and request for additional time. <br />This must be received no later than the deadline date. <br />If you hav any qu tions, please do not hesitate to call me at 303 - 866 -3567 Ext. 8124. <br />Peter S. Hays <br />Environmental Protection Specialist <br />Enclosure: Comment letters <br />Cc: Tom Kaldenbach, Division of Reclamation, Mining & Safety <br />