Laserfiche WebLink
Marcia Talvitie <br />Page 4of 6 <br />March 16, 2015 <br />11. Task 131, revegetation of the West Mine area, has been revised to remove <br />(revegetation failure remediation) for the 13.1 acres being released under SL-5. Task 131 has <br />been separated out to distinguish areas that will have Phase II <br />that will not (Task 131a). <br /> <br />12. In the Divisions previous reclamation cost estimate (SL-4), the total acres requiring <br />revegetation was erroneously calculated at 113.44. The total disturbed acreage f <br />requiring revegetation should be 155.10 acres. Tasks 130, 131, <br />revised to reflect the correct revegetation acreage. <br /> <br />13. Task 155, water augmentation for backfilling, should have been removed from the reclamation <br />cost estimate with the approval of SL-4 granting Phase I bond release on the East Mine. The <br />liability can be reduced accordingly under SL-5. <br /> <br />Additional Item of Note: <br /> <br />14. BRL has requested Phase II release on 13.8 acres at the West Mine area. To date, onl <br />acres have been Phase I released. Accordingly, the Division can <br />more than 13.1 acres at this time. <br /> <br />Should you or the operator have any questions, please let me know <br />