My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2015-03-16_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:26 PM
Creation date
3/18/2015 8:05:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/16/2015
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
SL5
Email Name
SLB
MLT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine (C1981038)Surety Release No. 5 (SL-5)Page 11of 128 <br />Cycle Time: <br />Scraper Loading Time:1.00Minutes <br />Maneuver and Spread Time:0.60Minutes <br />Job Condition Correction:Site Altitude: 7100 feet <br />ScraperPush DozerSource <br />Altitude Adj:1.000NA(CAT HB) <br />Job Efficiency:0.830NA(CAT HB) <br />Net Correction:0.830NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Travel Time <br />Seg #Haul Distance (Ft)Grade Roll. Res Total Res Velocity (fpm) <br />(min) <br />(%)(%)(%) <br />12500.005.003.008.0011312.26 <br />Haul Time:2.26minutes <br />Return Route: <br />Travel Time <br />Seg #Haul Distance (Ft)Grade Roll. Res Total Res Velocity (fpm) <br />(min) <br />(%)(%)(%) <br />12500.00-5.003.00-2.0029720.89 <br />Return Time:0.89minutes <br />Total Scraper team cycle time:4.75minutes <br />Adjusted for job conditions:608.08LCY/Hour <br />Selected Number of Scrapers:2Scraper(s) <br />Adjusted single scraper team (unit) hourly production:608.08LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production:608.08LCY/Hour <br />Unadjusted unit production/hour:732.63LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size:1Team(s)Total job time:2.19Hours <br />Unit cost:$1.466/LCYTotal job cost:$1,952 <br />
The URL can be used to link to this page
Your browser does not support the video tag.