Laserfiche WebLink
Bowie No. 1 Mine (C1981038)Surety Release No. 5 (SL-5)Page 10of 128 <br />SCRAPER TEAM WORK <br />Task description:Remove Gravel on Roads to Ponds 3 & 4 <br />Site:Bowie No. 1 MinePermit Action:Bond Release 5 (SL-5)Permit/Job#:C1981038 <br />PROJECT IDENTIFICATION <br />Task #:045State:ColoradoAbbreviation:None <br />Date:2/4/2015County:DeltaFilename:C038-045 <br />User:SLB <br />: <br />Agency or organization nameDRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />Equipment Description <br />-Scraper:Cat 637G w/push-pull <br />-Dozer:NA <br />Support Equipment -Load Area:NA <br />-Dump Area:NA <br />Road Maintenance –Motor Grader:CAT 14M <br />-Water Truck:Water Tanker, 5,000 Gal. <br />Cost Breakdown: <br />Scraper Work TeamSupport EquipmentMaintenance Equipment <br />Water Truck <br />ScraperDozerLoad AreaDump AreaMotor Grader <br />%Utilization-machine:100NANANA2525 <br />Ownership cost/hour: $110.90NANANA$42.03$20.53 <br />Operating cost/hour:$243.12NANANA$17.47$11.94 <br />Ripper op. cost/hour:NANANANA$0.00$0.00 <br />Operator cost/hour:$33.56NANANA$24.47$0.00 <br />Unit Subtotals:$387.59NANANA$83.96$32.48 <br />Number of Units:200011 <br />Group Subtotals:Work:$775.18Support:$0.00Maint:$116.44 <br />$891.62 <br />Total work team cost/hour: <br />MATERIAL QUANTITIES <br />Initial volume:1,256CCYSwell factor:1.060 <br />Loose volume:1,331LCY <br />Source of estimated volume:1988 Cyprus Estimate <br />Source of estimated swell factor:Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight:2,550 lbs/LCYStruck Volume:24.00LCY <br />Material description:Gravel -DryHeaped Volume:34.00LCY <br />Rated Payload:81,600 poundsAverage Volume:29.00LCY <br />Payload Capacity:32.00 LCYAdjusted Capacity:29.00LCY <br />