Laserfiche WebLink
Bowie No. 1 Mine (C1981038)Surety Release No. 5 (SL-5)Page 3of 128 <br />Reclamation management and/or administration:4.00%$80,537.70 <br />CONTINGENCY:0.00Total =$0.00 <br />TOTAL INDIRECT COST =$470,383.16 <br />TOTAL BOND AMOUNT (direct + indirect) =$2,199,283.16 <br />