Laserfiche WebLink
CRIPPLE CREEK -& VICTOR GOLD MINING Co. ` <br />ANGLOGOLD ASHANTI (COLORADO) amec ,t, <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Production drilling and blasting followed by slope grading occurred within the limits of the <br />Anaconda Mine Complex for subsequent geogrid placement. <br />11) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; SDCF sampling; clearing and grubbing; underground working <br />remediation and confirmatory drilling; topsoil removal; and monitoring spent ore placement in the <br />PSSA. <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Y Select Drain Cover Fill Samples SDCF 2 -C and SDCF 3 -C (Control samples). <br />General Project Items <br />Meetings and Discussions: <br />r The Weekly Contractor Meeting was held February 4, 2015 (Amec Foster Wheeler, CC &V, <br />Ames) <br />;= Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Eric Lorenson Date: February 10, 2015 <br />Reviewed by; r' ^-T — ~`�— `•_ _/ Date: February 10, 2015 <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects - -- "` <br />Reviewed By.- �, � —"� Date: -z-A-2-4,01.5 <br />Reviewed By: Date: <br />