Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; HVSCS riser pipe installation; and monitoring SO placement in the <br />PSSA. <br />11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 10 -1 through SO 13 -1 (information only). <br />General Proiect items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held February 25, 2015 (Amec Foster Wheeler, CC &V, <br />Ames) <br />'r Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler; and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Reviewed <br />Toff - 8UFk -har-d- fitiCjre _ ped c�na, <br />Project Resident r5- int_ - <br />Phone: 719- 689 -2986 <br />CC &V Projects , <br />Reviewed By: <br />Reviewed By: <br />Date: March 2, 2015 <br />Date: March 2, 2015 <br />Date: G <br />Date: -e,- j _ <br />