My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-03-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:12 PM
Creation date
3/12/2015 9:16:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/11/2015
Doc Name
CQA Report Week Ending 2/28/15
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Spent Ore: <br />Mine Operations hauled and stockpiled spent ore (SO) periodicaly in the PSSA using Cat 793 <br />haul trucks and a Cat dozer. Spent ore elevations were maintained above the drain cover fill <br />grade by at least 20 feet for 793 haul traffic. <br />Spent ore was placed and compacted as engineered fill beneath the footprint of the ADR2 <br />foundation. CQA monitoring was observed by New Fields. <br />Ames placed SO around the high volume solution collection system (HVSCS) riser piping. Amec <br />confirmed that rubber tired and dozer equipment stayed clear of the riser pipes during placement. <br />The last of the HVSCS 24" vertical steel risers was extended in a 31.5' section. The HVSCS <br />piping was welded into place and included level indicator piping. Adjustments were made by <br />Ames surveyors to ensure proper installation and that they were vertically plumb. The pipes were <br />wrapped with geomembrane before burial per project plans and site instruction. <br />Snow was removed from the access road and the security area, hauled, and dumped on the <br />north side of the ADR2 platform outside of the footprint. <br />Subgrade: Phase 2 rough subgrade preparation occurred. No additional subgrade was <br />approved during this reporting period. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />Leak Detection: No work was performed during this reporting period. <br />B) Underground Workings: <br />None. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.