Laserfiche WebLink
February 26, 2015 C-1980-004/McClane Canyon Mine ZTT <br /> <br /> <br /> <br />Sediment pond. Reestablished clean water diversion. <br />GENERAL MINE PLAN COMPLIANCE: <br />Pond cleanings have been stored above the pond along the sediment drying area. All sediment and pond cleanings <br />are confined by a berm and report back to the sediment pond. No issues were observed. <br /> <br />OTHER (SPECIFY): <br />Machine power wiring remains along the road. The wire was tangled and destroyed by the large storm that <br />occurred during the summer of 2014. Currently, the wire is too heavy and frozen to untangle and dispose of. Once <br />temperature allows, Corey Heaps stated the wire is to be salvaged or disposed of properly. <br />The mine has recently barricaded both portals and fan ventilation entries with concrete blocks to deter <br />unauthorized access to the underground workings as requested by MSHA. These barricades are to act as only <br />temporary deterrents and are not part of the mines approved reclamation plan. <br /> <br />Portal entry barricade. Ventilation entry barricade. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br />36 <br />Page of <br /> <br /> <br />