Laserfiche WebLink
Re- vegetation progress will be assessed on a yearly basis and will be supplemented with additional <br />seeding and mulching as necessary to result in a stand of dry land meadow grasses similar to conditions <br />at the site prior to disturbance. Time of seeding will be late fall through end of April, with a month long <br />window between June 15`h and July 15th depending on local rainfall patterns during that particular year. <br />Final slopes will be no greater than 3:1, H:V, with the visual berm along the south side of the permit area <br />left after mining for privacy and night -time headlight mitigation from Road 305. The berms will be <br />constructed with overburden materials, primarily sandy and gravelly soils encountered during gravel <br />extraction operations. <br />Earth berms are commonly used on large lot residential sites throughout the State to mitigate vehicle <br />lights that shine at homes over long distances from county roads as well as wind and visual screening. <br />When coupled with vegetative effort, berms can substantially alter micro - climate surrounding the home <br />and living space immediately adjacent. <br />7 <br />