Laserfiche WebLink
If <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and structural fill placement; SO and SLF sampling; clearing and grubbing; underground working <br />remediation and confirmatory drilling; topsoil removal; HVSCS riser pipe installation; and monitoring <br />spent ore placement in the PSSA. <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Spent Ore Samples SO 8 -1 and SO 9 -1 (information only). <br />Soil Liner Fill Samples SLF 173 -C. <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held February 18, 2015 (Amec Foster Wheeler, CC &V, <br />Ames) <br />Ames daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Eric Lore nson- - _ — Date: February 23, 2015 <br />Reviewed by: Date: February 23, 2015 _ <br />Tim Burkhard -' <br />Project Reside <br />Phone: 719 -6889 -2986 <br />CC&V Projects` - <br />Reviewed By: / Date: Z_1z5115 <br />Reviewed By: '� Date: <br />