My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-03-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:04 PM
Creation date
3/10/2015 8:45:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
3/5/2015
Doc Name
Weekly CQA - week ending 2/21/15
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T.; <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />A Cat mini - excavator began preparing anchor trench on Bench C including pre- excavation and <br />backfill of approximately 1 -foot below finished sub -grade elevation on the shoulder of the bench. <br />Approximately 250 feet' of anchor trench excavation and backfilling occurred. <br />Spent Ore: <br />Mine Operations hauled and stockpiled spent ore (SO) in the PSSA using Cat 793 haul trucks <br />and a Cat dozer. Spent ore elevations were maintained above the drain cover fill grade by at <br />least 20 feet for 793 haul traffic. <br />Spent ore was placed and compacted as engineered fill beneath the footprint of the ADR2 <br />foundation. CQA monitoring was observed by New Fields. <br />Ames placed SO around the high volume solution collection system ( HVSCS) riser piping. Amec <br />confirmed that rubber tired and dozer equipment stayed clear of the riser pipes during placement <br />and that lift surfaces were scarified prior to placement of subsequent lifts. <br />Three of the last four remaining HVSCS 24" vertical steel risers were extended in 31.5' sections. <br />The HVSCS piping was welded into place and included level indicator piping. Adjustments were <br />made by Ames surveyors to ensure proper installation. The pipes were wrapped with <br />geomembrane before burial per project plans and site instruction. <br />Subgrade: Phase 1 and 2 rough subgrade preparation occurred. No additional subgrade was <br />approved during this reporting period. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />Leak Detection: No work was performed during this reporting period. <br />B) Underground Workings: <br />None. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.