Laserfiche WebLink
DETAILED SITE INSPECTION OBSERVATIONS <br />Good housekeeping. Overall the site seems to be in compliance <br />GENERAL COMPLIANCE <br />There has been no additional site development. <br />SITE DEVELOPMENT <br />The mine is still operating in phase 1 and will be for quite some time. I <br />v� <br />passed 2 trucks hauling material driving in this morning. There are <br />approximately 5 floors to the site. The road up to the top level has been <br />Q <br />N <br />OPERATIONAL PHASE <br />fixed after the heavy rains this fall and the top floor (considered a half floor <br />spring) has been dropped about 20ft. It is currently being mined. <br />gthis <br />a <br />p <br />RECLAMATION STATUS <br />No reclamation has occurred recently. <br />Q <br />(TOPSOIL, ROADS, ETC.) <br />There is water holding in the pond on the 4th floor (developed during heavy <br />U <br />rains) and on the bottom floor. The water in the upper pond will be <br />cc <br />pumped to the lower pond. The west - facing benches on the BLM are fairly <br />°U <br />EROSION/ SEDIMENTATION <br />eroded in sections after,the heavy rains this fall. Additional reclamation <br />z <br />may be needed during final reclamation of the site. Water flow and erosion <br />have been contained. <br />EXPLOSIVES <br />Not stored on site. <br />SAFETY <br />No issues observed. <br />There does not appear to be any problems with engineering or geologic <br />ENGINEERING/ GEOLOGIC & STABILITY <br />stability conditions, with the exception of the bench situation that was <br />CONDITIONS <br />reviewed with the operator during previous site visits. <br />OTHER LOCAL/ STATE/ FEDERAL REQ. & <br />Not reviewed at this time. <br />COMPLIANCE <br />