Laserfiche WebLink
APPLICATION FORM <br />5. On page 2 of the application, the responses to the questions numbered 6 and 7 do not match the <br />persons listed in Exhibit). Please correct this be listing the same individuals or stating "refer to Exhibit <br />O" and resubmit page 2. <br />A corrected Page 2 is attached. Exhibit O and Page 2 should now match. <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS — REGULAR 112 OPERATIONS <br />The following items must be addressed by the applicant in order to satisfy the requirements of C.R.S. 34- <br />32.5 -101 et seq. and the Mineral Rules and Regulations of the Mined Land Reclamation Board: <br />6.4.3 Exhibit C - Pre - Mining and Mining Plan Map(s) of Affected Land <br />6. The Soil Resource Report Map does not include all soil unites for the proposed area. Please resubmit <br />the map and report, if necessary, showing a larger data window to include all area of the new permit <br />boundary. <br />Attached is a revised Pre - mining map showing all soil units and the expanded boundary. <br />7. Under the requirements of Rule 1. 11.2(3) (b), please submit a map showing the area mined or disturbed <br />and the area reclaimed since the original application. Though not specifically required under Exhibit C, <br />the Division recommends submitting it under this exhibit to help define the pre - amendment conditions. <br />Attached is a map showing the area mined or disturbed prior to this amendment. <br />6.4.4 Exhibit D - Mining Plan <br />8. The Exhibit D Mining Plan Map needs to show the new permit boundary as well as the original. In <br />addition, this map should also indicate where current mining has occurred. <br />Attached is a revised Exhibit D Mining Map showing the new permit boundary and where current <br />mining has occurred. <br />6.4.5 Exhibit E - Reclamation Plan <br />9. The Reclamation Plan states that the small addition to the north has stockpiled material from a previous <br />disturbance and would be left as is, but would be seeded for reclamation. During the July 9, 2014 site <br />inspection, it was apparent that this area was re- disturbed by the current operation. Please commit to <br />reclaiming this area with the same standards outline in the Reclamation Plan for the rest of the site. <br />The small addition to the north will be reclaimed with the same standards as defined for the rest of <br />the site. <br />10. In the paragraph titled Revegetation Program in the attached 2008 Exhibit E Reclamation Plan, it <br />discusses that the program was devised from review of the NRCS report. The Division believes the <br />