My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-12_REPORT - M1983194
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983194
>
2015-02-12_REPORT - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:26 PM
Creation date
2/26/2015 9:20:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REPORT
Doc Date
2/12/2015
Doc Name
Annual Fee, Report, and Map
From
Natural Soda, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natural Soda, LLC 2014 Project Status Report & Annual Plan of Development <br />6.3 Reclamation Activity <br />6.3.1 Regrading & Scarification <br />Regrading and scarification activities occurred in 2014 predominantly in support of the <br />' 2014 RDP project. Well pads & roads disturbed for the 2014 RDP project were <br />regraded completely for reclamation purposes on the 2014 P &A wells. The existing <br />access roads on the Northern Shell property were returned to their original state. 2014 <br />' Wells that were completed as water monitor wells or water supply wells had their <br />associated pads and locations regraded (interim reclamation) so as to be still accessible <br />by NS personnel. <br />6.3.2 Seeding & Weed Control <br />' The majority of seeding activity in 2014 focused on the areas disturbed due to the 2014 <br />RDP project. The access roads and all pads disturbed on the phase 2 wells were <br />completely reclaimed and reseeded in late fall of 2014. The areas disturbed for the <br />building of the WSW -3 and WSW -4 water supply wells and pipelines were also <br />reseeded in late fall 2014. The regraded disturbed pads for the WSW -3, DS -7, CH -C, <br />and CH -H have been reseeded as of late fall of 2014. NS plans to reseed the <br />' remaining phase I locations and the WSW -4 location during the first quarter of 2015. <br />Reseeding of the working surfaces of the BG -5, BG -6, DS -4 and DS -5 locations will be <br />undertaken in 2015 for the control of weeds noted per Mr. Rusty Roberts. The <br />' recommendation to reseed the afore mentioned locations can be found in the 2014 <br />Vegetation Monitoring Reclamation Status Report prepared by Mr. Rusty Roberts found <br />in Appendix C of this report. <br />6.3.3 Reclamation Fencing <br />Repair and maintenance was performed, as necessary, on existing fences in 2014 as <br />' needed. Fencing is utilized to keep livestock and wildlife out of the reclamation areas. <br />6.3.4 Precipitation <br />' Precipitation gauges are located near the plugged and abandoned well 90 -5 (tipping <br />gauge) and near monitoring well EX -2 (V- gauge). Based on perennial vegetation, which is <br />an indicator of long -term precipitation, the "normal" precipitation for the NS site is 12 -14 <br />inches for the calendar year. The distribution of precipitation is important for proper <br />reclamation. Table 8 provides a composite of precipitation from the two gauges at NS <br />Imine site: <br />i <br />DAUB & ASSOCIATES, INC. ,. 24 January 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.