Laserfiche WebLink
AA Natural Soda, LLC 2014 Project Status Report & Annual Plan of Development <br />4.1.4 Wells Associated With the NS Project <br />' The following well -field related activities occurred in 2014: Refer to Figure 3 & Figure 4 <br />Plant and Well Location Map. <br />C <br />• The DVPW continued limited production in 2014. <br />• The 14H production pair was drilled and brought online in 2014. <br />• The 8H production pair was drilled and will be brought online in early 2015. <br />• The WSW -3 water supply well was drilled and completed in August of 2014. <br />• The WSW -4 water supply wells was drilled and completed in August of 2014. <br />• Ten new exploratory core holes were drilled, plugged, and abandoned. <br />• Seven new exploratory core holes were drilled and converted into groundwater <br />monitoring wells. <br />• The Simple Oil, LLC (SO) well, DS -6 was drilled, cored, and converted into a <br />groundwater monitoring well to support the SO OSR project, and to act as an <br />additional DS aquifer monitoring well for NS. <br />The current status of all wells associated with the NS Project is indicated in Table 3: List of <br />NS Wells and Well Status. <br />4.1.5 Other Activities <br />Continuous monitoring of proximal DS aquifer monitor wells provided data for the <br />management of active production cavity operations. Throughout the year, injection and <br />recovery rates were adjusted to maintain monitoring well water levels within target <br />zones. <br />' DAUB & ASSOCIATES. INC. ,. 12 January 2015 <br />