Laserfiche WebLink
Blue Valley Pit Incompleteness <br />Page 2 of 3 <br />February 24, 2015 <br />4. Rule 6.3.1(3) requires the location map include the names of all immediately adjacent surface <br />owners of record. Please update Exhibit A to indicate the adjacent surface owners. Please <br />include the surface owners west of Highway 9, if within 200 feet of the affected area. <br />6.3.3 Exhibit C - Mining Plan <br />5. As required by Rule 6.3.3(b), please specify how the topsoil will be stockpiled and stabilized <br />with a vegetative cover or other means until used in reclamation. <br />6. As required by Rule 6.33(c), please specify the location of the overburden stockpiles on <br />Exhibit E - Map. <br />7. As required by Rule 6.3.3(h), please specify how much water will be used in conjunction <br />with the operation. <br />8. The Applicant states the source of water for the operation is the Colorado River. Please <br />provide documentation the Applicant is permitted to use water from the Colorado River for <br />the mining operation. <br />6.3.5 Exhibit E - Maps <br />9. Please update the Exhibit E maps in response to Question #4 above as needed. <br />6.3.7 Exhibit G - Source of Legal Right to Enter <br />10. Please provide a signed copy of the Colorado State Land Board lease agreement allowing the <br />extraction of sand and gravel at the site. <br />6.3.9 Exhibit I - Proof of Filing with County Clerk <br />11. Please provide an affidavit or receipt indicating the date on which the revised application <br />documents were placed with the Grand County Clerk and Recorder in response to this letter. <br />The application will not be considered filed until the information listed above is received and <br />found sufficient to begin our review. A decision date will be established 15 days from the date of <br />receipt of all of the requested information. <br />You have sixty (60) days from the above date to submit all necessary documents that the Office <br />needs for an application to be considered filed. If, at the end of the sixty day period, the <br />application has not been determined to be filed with the Office, the Office shall deny the <br />application and terminate the application file. <br />The response due date is April 25, 2015. <br />