Laserfiche WebLink
Oakridge Energy, Inc.25-Feb-2015 <br />C-1992-080 / PR-01 / AdeqReview#2Page 4of 6 <br />shall be selected to represent each plant community within the disturbed area. Please <br />explain why a mountain shruband pinyon juniper vegetation community is being <br />proposed as a reference area for a dryland pasture. <br />DRMS 02/25 <br />:The text was amended to explain that the reference area was selected in <br />consultation with CDRMS. The area was undisturbed, adjacent to the reclaimed mine <br />site, and representative of the range in native vegetation communities as well as the post- <br />This item has been satisfactorily addressed. <br />mining land use vegetation. <br />DRMS 12/08 <br />6.:Please include a discussion as to how the reference area will be managed <br />especially as it pertains to grazing and weed control (Rule 4.15.7(3)(d)). <br />DRMS 02/25This <br />: Text regarding management was provided on revised page 5-11. <br />item has been satisfactorily addressed. <br />DRMS 12/08 <br />7.:The permit text on page 5-17 has the heading 2.05.5(2) Proposed Post- <br />Mining Land Use (2014). Rule 2.05.5(2) is actually about the post mining land uses for <br />underground mines. Please amend the nomenclature so it does not appear that <br />underground mining activities are being addressed. Also, please remove ‘Proposed’ in <br />the heading. <br />DRMS 02/25This item has <br />: Headings and text for 2.05.5 were revised, as requested. <br />been satisfactorily addressed. <br />2.05.5–Post Mining Land Uses <br />DRMS 12/08 <br />1.:A map of the post mining land uses was not included in the permit <br />application. Please submit a map prepared to the standards of Rule 2.10 showing all the <br />post mining land uses for the area within the current permit boundary (Rule 2.05.5(1)(c)). <br />DRMS 02/25 <br />:Map 5-8 was provided with the response package. Reclamation features, <br />Thisitemhas <br />post mining land uses, and the revegetation reference area are shown. <br />beensatisfactorilyaddressed. <br />2.10 Maps and Plans <br />DRMS 02/25(New) <br />1.: Maps 5-7 (Disturbed Area) and 5-8 (Reclamation Features, PMLU, <br />and DP Reference Area) were submitted with the adequacy response. The maps are at a <br />scale of 1” = 400’ andpresent the information in a clear manner. In accordance with <br />Rule 2.10.3(2), the maps must be certified by a registered professional engineer or <br />Please submit three certified copies of each map. <br />professional geologist. <br />Appendix 5-14 <br />DRMS 12/08 <br />1.:On page 1, the second paragraph of the introduction describes the location <br />of the mine site and references figure 1. Figure 1 was not included with this appendix. <br />Please submit figure 1 which shows the location of the mine site. <br />