Laserfiche WebLink
Oakridge Energy, Inc.25-Feb-2015 <br />C-1992-080 / PR-01 / AdeqReview#2Page 2of 6 <br />DRMS 02/25This item has been <br />: Section 2.05.3(3) was revised as requested. <br />satisfactorily addressed. <br />DRMS 02/25(New) <br />2.: Map 5-7 Disturbed Area was submitted with the response package. <br />Please revise the text of 2.05.3(3) to direct the reader to this map. <br />(The Mine Support <br />Facilities subsection mentions Map 5-2;areference to Map 5-7 could be added to that <br />paragraph.) <br />2.05.4(2) –Reclamation Plan Elements <br />DRMS 12/08 <br />1.:The text on page 5-7 states that the post mining land use is industrial, <br />commercial, recreation and residential which is different than the discussion in Section <br />2.05.5(2) on page 5-17 stating that the PMLU is dryland pasture. Please correct the <br />description on page 5-7 soit is consistent with the requested change in PMLU. <br />DRMS 02/25 <br />: References to the PMLU were removed from the introductory paragraph. <br />This item has been satisfactorily addressed. <br />DRMS 12/08 <br />2.:The first paragraph gives the disturbed area as being 37+acres. Please <br />revise this section to reflect the acreages shown under 2.05.2(2), above. <br />DRMS 02/25This item <br />: The reference to the size of the disturbed area was removed. <br />has been satisfactorily addressed. <br />DRMS 02/25(New) <br />3.: Map 5-7 Disturbed Areawas submitted with the response package. <br />Please amend the first paragraphof 2.05.4to direct the reader to this map. <br />2.05.4(2)(b) –Reclamation Cost <br />DRMS 12/08 <br />1.:The current reclamation cost estimate approved in RN-4 has five <br />remaining reclamationtasks with an estimated cost of $84,714.36; however, the permit <br />states that there are no known remaining reclamation obligations and that DRMS is <br />required to maintain a minimum bond of $10,000. This paragraph in the permit (page 5- <br />7) does not reflect thecurrent reclamation cost estimate and implies the remaining state <br />held bond is $10,000. Please amend this paragraph to discuss the remaining reclamation <br />tasks or reference the current reclamation cost estimate. <br />DRMS 02/25 <br />: The text was revised to clarify the question of the required bond amount. <br />This item has been satisfactorily addressed. <br />2.05.4(2)(d) –Soil Replacement <br />DRMS 12/08 <br />1.:Please amend this section to describe the thickness of topsoil that was <br />redistributed, in accordance with 4.06.4(2)(a). <br />DRMS 02/25 <br />: The paragraph was revised to say that a minimum of 12 inches of topsoil <br />This item has been satisfactorily addressed. <br />was redistributed. <br />