Laserfiche WebLink
February 19, 2015 C- 1982- 056/Foidel Creek Mine JDM <br />Construction of the underdrain continues to the southeast and up the drainage. No problems were noted with the <br />underdrain construction. <br />4 <br />Underdrain Construction <br />RDA Topsoil Stripped Area <br />SUPPORT FACILITIES - Rule 4.04: <br />Construction continues on the 5 MN cement borehole as approved in MR -283. The access road and pad have been <br />graded and topsoil stockpiled. Equipment was on -site but inactive at the time of the inspection. Erosion control <br />was in place at the time of the inspection with disturbance area markers as approved. Drilling has been completed <br />and the pad was stable at the time of the inspection. No problems were noted, with the exception of the following: <br />- The topsoil piles will require grading and seeding in the spring as conditions allow. Long term signage will be <br />required on all topsoil piles and the approved disturbance area of the pad. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />