My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-26_PERMIT FILE - C1981012A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2015-01-26_PERMIT FILE - C1981012A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:25 AM
Creation date
2/18/2015 10:38:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
1/26/2015
Doc Name
Bond Calculations (RN5, TR50 & TR51)
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Task # 633 <br />Truck Bed (volume) Basis: <br />Source <br />Altitude Ad': <br />Struck Volume: <br />10.00 <br />LCY <br />Heaped Volume: <br />12.00 <br />LCY <br />Average Volume: <br />11.00 <br />LCY <br />Adjusted Volume: <br />12.00 <br />LCY <br />Constant o eration -0.04 <br />Final Truck Volume Based on Number of Loader Passes: 9.46 <br />Loading Tool Capacity <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />4.300 <br />LCY (heaped) <br />Bucket Fill Factor: <br />1.100 <br />Other - rock/dirt mixtures (100-120%)1.100 <br />Adjusted Capacity: <br />4 730 <br />LCY <br />Job Condition Corrections: Site Altitude (ft.): 7500 feet <br />Net Correction: 0.830 0.830 <br />Loadin¢ Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 minutes <br />Page 2 of 3 <br />LCY <br />2 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Net Correction: 0.830 0.830 <br />Loadin¢ Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 minutes <br />Page 2 of 3 <br />LCY <br />2 passes <br />Cycle Time Factors <br />Net Cycle lime Adjustment: -0.070 <br />Factor min. <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />Cat HB <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />Cat HB <br />Operation: <br />Constant o eration -0.04 <br />-0.040 <br />(Cat HB <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB) <br />CIRCES Cost Estimating Software <br />Net Cycle lime Adjustment: -0.070 <br />minutes <br />Adjusted Loader Cycle Time: 0.430 <br />minutes <br />Net Load Time per Truck: 0.530 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: <br />0.50 Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Truck Load Time: <br />0.530 Minutes Adjusted for site altitude: <br />0.530 Minutes <br />Truck Maneuver and Dump Time: <br />0.90 Minutes Adjusted for site altitude: <br />0.900 Minutes <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.