My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-26_PERMIT FILE - C1981012A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2015-01-26_PERMIT FILE - C1981012A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:25 AM
Creation date
2/18/2015 10:38:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
1/26/2015
Doc Name
Bond Calculations (RN5, TR50 & TR51)
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Backfill and Regrade Transformer and Rock Dust Cut Slope <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 603 State: Colorado <br />Date: 5/12/2014 County: Las Animas <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Generic 10 -12 c , 6x4 <br />- Loader: CAT 950H <br />Support Equipment -Load Area: Cat 139T - 9SU <br />-Dump Area: Cat 139T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Abbreviation: None <br />Filename: C012 -633 <br />Shift basis: der day <br />Cnst Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $1,014.79 <br />MATERIAL OUANTITIES <br />Initial volume: 17,500 CCY Swell factor: 1.125 <br />Loose volume: 19,688 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 35,400.00 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$12.65 <br />$24.51 <br />$72.57 <br />$72.57 <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$63.40 <br />$43.81 <br />$143.16 <br />$143.16 <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$76.05 <br />$105.45 <br />$253.73 <br />$253.73 <br />$101.43 <br />$72.30 <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $333.60 <br />Support: $507.46 <br />Maint: $173.73 <br />Total work team cost/hour: $1,014.79 <br />MATERIAL OUANTITIES <br />Initial volume: 17,500 CCY Swell factor: 1.125 <br />Loose volume: 19,688 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Estimate <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Payload (weight) Basis: <br />Material weight: 1 Pounds /LCY <br />Description: User Provided <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 35,400.00 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.