Laserfiche WebLink
February 11, 2015 C- 1992- 081/1-layden Gulch Loadout JHB <br />The TAHR was well graded. Runoff was directed off the haul road appropriately. No ponding of water <br />on the haul road was observed. <br />Truck traffic was using the TAHR during the inspection. The TAHR was in good condition during this inspection. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The regraded facilities and office areas showed no evidence of rill or gully formation. No apparent <br />trespass could be noted on the reclaimed areas. <br />Areas that still require reclamation include the substation, the rail loop, cut and fill areas of the rail loop, both <br />ponds, the haul road and associated topsoil piles. <br />DOCUMENTS RECEIVED NA <br />OTHER (SPECIFY) NA <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 5 <br />