Laserfiche WebLink
4° <br />amec <br />foster <br />wheeler <br />Leak Detection: No work was performed during this reporting period. <br />B) Underground Workings: <br />No work was performed during this reporting period. <br />C) Geomembrane: <br />Phase 1 80 -mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br />D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br />E) High Volume Solution Collection System Piping (HVSCS): <br />No work was performed during this reporting period. <br />11) Storm Water Management <br />No observations to report during this period. <br />CQA ACTIVITIES: <br />1) Field Activities: None. - - - -- - -i <br />II) Laboratory Activities: None. <br />General Project Items <br />Meetings and Discussions: None <br />Summary of Concerns: None. <br />CC &V: None. <br />Miscellaneous: No work was performed during this reporting period for the holiday break. <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Reviewed by: <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: January 21, 2015 <br />Date: January 21, 2015 <br />Date: z1 ZI 5 <br />Date: <br />2015- 01- 03 -mle2 weekly finalit.docx Page 2 of <br />