T <br />Ma .i 3 <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. amec <br />ANGLOGOLD ASHANTI (COLORADO) foster <br />SQUAW GULCH (VLF) WEEKLY REPORT wheeler <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: January 3, 2015 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 12.28.2014 through 1.3.2015 <br />Days <br />S <br />I M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />H <br />H <br />H <br />H <br />H <br />D =Day Shift H= Holiday W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 3 °F to 27 °F Cloud Cover: Not recorded <br />Lows: -10 °F to 8 °F Precipitation: Not recorded <br />Wind: Variable <br />Ames: No activity reported during this period. <br />Planning: No activity reported during this period. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) No work was conducted for the holiday break. <br />Topsoil /Overburden Stripping: None. <br />Tree Grubbing and Clearing, Chipping: None. <br />Production Drilling: None. <br />Production Blasting: None. <br />Structural Fill: No work was performed during this reporting period. <br />Subgrade: No work was performed during this reporting period. <br />Soil Liner Fill (SLF): (Placement Operations Temporarily Suspended) <br />Cameron Site: No work was performed during this reporting period. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />2015 -01- 03 -mle2 weekly final- rl.docx Page 1 of 3 <br />