Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 2 of 558
<br />039
<br />040
<br />041
<br />042
<br />043
<br />044
<br />045
<br />046
<br />050
<br />051
<br />052
<br />053
<br />054
<br />060
<br />061
<br />062
<br />063
<br />064
<br />065
<br />066
<br />070
<br />071
<br />072
<br />073
<br />074
<br />075
<br />076
<br />077
<br />078
<br />079
<br />080
<br />081
<br />082
<br />083
<br />084
<br />085
<br />086
<br />090
<br />091
<br />092
<br />093
<br />095
<br />096
<br />097
<br />098
<br />099
<br />100
<br />101
<br />102
<br />106
<br />Compact Refuse on Gob Pile 92
<br />COMPACT
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />4
<br />4
<br />4
<br />4
<br />4
<br />4
<br />1
<br />4
<br />1
<br />4
<br />1
<br />4
<br />1
<br />4
<br />4
<br />4
<br />4
<br />1
<br />4
<br />4
<br />4
<br />4
<br />4
<br />4
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />2
<br />1
<br />1
<br />153.51
<br />$22,691.00
<br />$324,086.00
<br />$24,677.00
<br />$1,283.00
<br />$9,285.00
<br />$102,072.00
<br />$96,532.00
<br />$101,324.00
<br />$85,364.00
<br />$9,365.00
<br />$31,919.00
<br />$19,028.00
<br />$271.00
<br />$452.00
<br />$5,429.00
<br />$3,016.00
<br />$86,362.00
<br />$11,242.00
<br />$5,429.00
<br />$157.00
<br />$171,030.00
<br />$17,942.00
<br />$3,152.00
<br />$7,488.00
<br />$4,334.00
<br />$96,649.00
<br />$35,786.00
<br />$3,465.00
<br />$7,549.00
<br />$1,082.00
<br />$2,854.00
<br />$2,459.00
<br />$307.00
<br />$640.00
<br />$1,395.00
<br />$53,278.00
<br />$116,694.00
<br />$18,161.00
<br />$2,364.00
<br />$967.00
<br />$7,079.00
<br />$2,786.00
<br />$4,115.00
<br />$2,900.00
<br />$3,852.00
<br />$8,733.00
<br />$540.00
<br />$313.00
<br />$33,669.83
<br />$5,631.61
<br />Haul refuse out of Gob Pile #2/ #3 drying areas for
<br />placement
<br />TRUCKI
<br />909.13
<br />Compact Refuse at Gob Pile #3
<br />COMPACT
<br />166.94
<br />Haul Topsoil from Stockpile Area to Gob Pile #1
<br />SCRAPERI
<br />2.18
<br />Place 3.5' of Coverfill on Gob Pile #1
<br />SCRAPERI
<br />15.80
<br />Place Coverfill from Stockpiles on Gob Pile #2
<br />SCRAPERI
<br />173.74
<br />Haul Cover Material from Gob Pile #3 to Gob Pile #2
<br />TRUCKI
<br />235.64
<br />Place 2.5' of Coverfill on Gob Pile #3, from stockpile
<br />SCRAPERI
<br />172.47
<br />Compact Backfilled D- Portal Bench,Roads, & Utility
<br />Corridor
<br />COMPACT
<br />577.52
<br />Compact Backfilled Material at Truck Loadout /Coal
<br />Stockpile
<br />COMPACT
<br />63.35
<br />Compact Backfilled Train Loadout
<br />COMPACT
<br />215.94
<br />Compact B -Seam Portal Bench
<br />COMPACT
<br />128.72
<br />Compact Backfilled Freeman Gulch Vent Shaft Pad
<br />COMPACT
<br />1.83
<br />Rip Utility Bench
<br />RIPPER
<br />0.30
<br />Rip D- Portal Bench
<br />RIPPER
<br />3.71
<br />Rip Truck Loadout /Coal Stockpile Area
<br />RIPPER
<br />2.06
<br />Rip Regraded Mine Area Prior to Topsoil Replacement
<br />RIPPER
<br />59.09
<br />Rip Train Loadout Facilities and Railbed Benches
<br />RIPPER
<br />7.69
<br />Rip B -Seam Portal Bench
<br />RIPPER
<br />3.71
<br />Rip Rock Laydown Pad Topsoil
<br />RIPPER
<br />0.43
<br />Rip Haul Roads (Portion Being Reclaimed) & Old
<br />Truck Loadout
<br />RIPPER
<br />116.47
<br />Remove Haul Road Subbase and Place on Gob Pile #1
<br />SCRAPERI
<br />30.54
<br />Rip Truck Loadout Road
<br />RIPPER
<br />2.14
<br />Haul Truck Loadout Subbase to Gob Pile #1
<br />SCRAPERI
<br />12.75
<br />Rip Upper Haul Road Asphalt Prior to Road Narrowing
<br />RIPPER
<br />2.95
<br />Pull Back/Haul Fill Mat'l from Upper Haul Rd
<br />Narrowing
<br />TRUCKI
<br />141.47
<br />Regrade Narrowed Section of Haul Road
<br />DOZER
<br />26.11
<br />Rip Gob Pile #1 Road
<br />RIPPER
<br />2.35
<br />Regrade Gob Pile #1 Road
<br />DOZER
<br />5.17
<br />Rip Access Road
<br />RIPPER
<br />0.73
<br />Haul Access Road Surface to Gob Pile #1
<br />SCRAPERI
<br />4.86
<br />Regrade Access Road
<br />DOZER
<br />1.79
<br />Rip Freeman Gulch Vent Shaft Light -Use Road
<br />RIPPER
<br />0.20
<br />Backfill and Regrade Haul Road to Gob Pile #2
<br />DOZER
<br />0.44
<br />Rip Lower Haul Road
<br />RIPPER
<br />0.95
<br />Regrade Lower Haul Road
<br />DOZER
<br />36.46
<br />Regrade Light Use Roads from MRs and TRs
<br />DOZER
<br />79.85
<br />Finish Grade Disturbed Mine Area
<br />GRADER
<br />129.92
<br />Finish Grade Train Loadout
<br />GRADER
<br />16.91
<br />Finish Grade B -Seam Portal Bench
<br />GRADER
<br />6.91
<br />Finish Grade Gob Piles 91, #2, 93, and #4
<br />GRADER
<br />50.64
<br />Backfill and Regrade Pond B
<br />DOZER
<br />7.63
<br />Backfill and Regrade Pond C
<br />DOZER
<br />11.61
<br />Backfill and Regrade Gob Pile Pond D
<br />DOZER
<br />8.18
<br />Backfill and Regrade Pond F
<br />DOZER
<br />10.87
<br />Backfill and Regrade Pond J
<br />DOZER
<br />24.64
<br />Backfill and Regrade Pond K
<br />DOZER
<br />1.52
<br />Excavate for Post - mining Channel at B -Seam Portals
<br />EXCAVATE
<br />0.63
<br />Postmining Channel Construction
<br />NA
<br />69.02
<br />Plug and seal EM98 -1
<br />BOREHOLE
<br />12.00