Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 2 of 558 <br />039 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />106 <br />Compact Refuse on Gob Pile 92 <br />COMPACT <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />153.51 <br />$22,691.00 <br />$324,086.00 <br />$24,677.00 <br />$1,283.00 <br />$9,285.00 <br />$102,072.00 <br />$96,532.00 <br />$101,324.00 <br />$85,364.00 <br />$9,365.00 <br />$31,919.00 <br />$19,028.00 <br />$271.00 <br />$452.00 <br />$5,429.00 <br />$3,016.00 <br />$86,362.00 <br />$11,242.00 <br />$5,429.00 <br />$157.00 <br />$171,030.00 <br />$17,942.00 <br />$3,152.00 <br />$7,488.00 <br />$4,334.00 <br />$96,649.00 <br />$35,786.00 <br />$3,465.00 <br />$7,549.00 <br />$1,082.00 <br />$2,854.00 <br />$2,459.00 <br />$307.00 <br />$640.00 <br />$1,395.00 <br />$53,278.00 <br />$116,694.00 <br />$18,161.00 <br />$2,364.00 <br />$967.00 <br />$7,079.00 <br />$2,786.00 <br />$4,115.00 <br />$2,900.00 <br />$3,852.00 <br />$8,733.00 <br />$540.00 <br />$313.00 <br />$33,669.83 <br />$5,631.61 <br />Haul refuse out of Gob Pile #2/ #3 drying areas for <br />placement <br />TRUCKI <br />909.13 <br />Compact Refuse at Gob Pile #3 <br />COMPACT <br />166.94 <br />Haul Topsoil from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />2.18 <br />Place 3.5' of Coverfill on Gob Pile #1 <br />SCRAPERI <br />15.80 <br />Place Coverfill from Stockpiles on Gob Pile #2 <br />SCRAPERI <br />173.74 <br />Haul Cover Material from Gob Pile #3 to Gob Pile #2 <br />TRUCKI <br />235.64 <br />Place 2.5' of Coverfill on Gob Pile #3, from stockpile <br />SCRAPERI <br />172.47 <br />Compact Backfilled D- Portal Bench,Roads, & Utility <br />Corridor <br />COMPACT <br />577.52 <br />Compact Backfilled Material at Truck Loadout /Coal <br />Stockpile <br />COMPACT <br />63.35 <br />Compact Backfilled Train Loadout <br />COMPACT <br />215.94 <br />Compact B -Seam Portal Bench <br />COMPACT <br />128.72 <br />Compact Backfilled Freeman Gulch Vent Shaft Pad <br />COMPACT <br />1.83 <br />Rip Utility Bench <br />RIPPER <br />0.30 <br />Rip D- Portal Bench <br />RIPPER <br />3.71 <br />Rip Truck Loadout /Coal Stockpile Area <br />RIPPER <br />2.06 <br />Rip Regraded Mine Area Prior to Topsoil Replacement <br />RIPPER <br />59.09 <br />Rip Train Loadout Facilities and Railbed Benches <br />RIPPER <br />7.69 <br />Rip B -Seam Portal Bench <br />RIPPER <br />3.71 <br />Rip Rock Laydown Pad Topsoil <br />RIPPER <br />0.43 <br />Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER <br />116.47 <br />Remove Haul Road Subbase and Place on Gob Pile #1 <br />SCRAPERI <br />30.54 <br />Rip Truck Loadout Road <br />RIPPER <br />2.14 <br />Haul Truck Loadout Subbase to Gob Pile #1 <br />SCRAPERI <br />12.75 <br />Rip Upper Haul Road Asphalt Prior to Road Narrowing <br />RIPPER <br />2.95 <br />Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCKI <br />141.47 <br />Regrade Narrowed Section of Haul Road <br />DOZER <br />26.11 <br />Rip Gob Pile #1 Road <br />RIPPER <br />2.35 <br />Regrade Gob Pile #1 Road <br />DOZER <br />5.17 <br />Rip Access Road <br />RIPPER <br />0.73 <br />Haul Access Road Surface to Gob Pile #1 <br />SCRAPERI <br />4.86 <br />Regrade Access Road <br />DOZER <br />1.79 <br />Rip Freeman Gulch Vent Shaft Light -Use Road <br />RIPPER <br />0.20 <br />Backfill and Regrade Haul Road to Gob Pile #2 <br />DOZER <br />0.44 <br />Rip Lower Haul Road <br />RIPPER <br />0.95 <br />Regrade Lower Haul Road <br />DOZER <br />36.46 <br />Regrade Light Use Roads from MRs and TRs <br />DOZER <br />79.85 <br />Finish Grade Disturbed Mine Area <br />GRADER <br />129.92 <br />Finish Grade Train Loadout <br />GRADER <br />16.91 <br />Finish Grade B -Seam Portal Bench <br />GRADER <br />6.91 <br />Finish Grade Gob Piles 91, #2, 93, and #4 <br />GRADER <br />50.64 <br />Backfill and Regrade Pond B <br />DOZER <br />7.63 <br />Backfill and Regrade Pond C <br />DOZER <br />11.61 <br />Backfill and Regrade Gob Pile Pond D <br />DOZER <br />8.18 <br />Backfill and Regrade Pond F <br />DOZER <br />10.87 <br />Backfill and Regrade Pond J <br />DOZER <br />24.64 <br />Backfill and Regrade Pond K <br />DOZER <br />1.52 <br />Excavate for Post - mining Channel at B -Seam Portals <br />EXCAVATE <br />0.63 <br />Postmining Channel Construction <br />NA <br />69.02 <br />Plug and seal EM98 -1 <br />BOREHOLE <br />12.00 <br />