Laserfiche WebLink
Bowie No. 2 Mine C1996083 Midterm Review No. 4 (MT -4) Page 1 of 558 <br />COST SUMMARY WORK <br />Task description: Midterm Review Cost Summary <br />Site: Bowie No. 2 Mine Permit Action: Midterm Review 4 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 1/30/2015 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />036 <br />037 <br />038 <br />Pull back and Haul Portal Bench Fill Material to Cut <br />Slope <br />TRUCKI <br />1 <br />4 <br />2 <br />4 <br />4 <br />2 <br />4 <br />2 <br />4 <br />2 <br />4 <br />4 <br />1 <br />1 <br />4 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />609.56 <br />$416,433.00 <br />$216,603.00 <br />$12,387.00 <br />$6,143.00 <br />$2,372.00 <br />$10,554.00 <br />$11,251.00 <br />$73,222.00 <br />$44,382.00 <br />$214,221.00 <br />$235,140.00 <br />$7,696.00 <br />$35,621.00 <br />$59,703.00 <br />$56,562.00 <br />$1,150.00 <br />$654.00 <br />$11,835.00 <br />$146,517.00 <br />$657.00 <br />$50,703.00 <br />$888.00 <br />$26,238.00 <br />$2,586.00 <br />$908.00 <br />$25,814.00 <br />$4,301.00 <br />$122,722.00 <br />$138,062.00 <br />$1,978.00 <br />Regrade D- Portal Bench <br />DOZER <br />158.03 <br />Pull up Material for Utility Corridor <br />EXCAVATE <br />24.96 <br />Regrade Utility Corridor <br />DOZER <br />4.48 <br />Rip and Regrade Material Storage Area at Gob Pile <br />DOZER <br />1.73 <br />Pull Back Material @ Old Truck Loadout Material <br />Storage Area <br />EXCAVATE <br />21.27 <br />Regrade Old Truck Loadout Material Storage Area <br />DOZER <br />8.21 <br />Pull Back Material at Truck Loadout/Coal Stockpile <br />EXCAVATE <br />147.57 <br />Regrade New Truck Loadout and Coal Stockpile <br />DOZER <br />32.38 <br />Pull Material Back onto Train L/O Facil. and Railbed <br />Benches <br />EXCAVATE <br />431.74 <br />Regrade Train Loadout Facilities and Railbed Benches <br />DOZER <br />171.56 <br />Backfill and Regrade Train L/O Overland Conveyor <br />Corridor <br />DOZER <br />5.62 <br />Haul Fill from Upper Mat'l Strge Area to B -Seam <br />Portal Bench <br />SCRAPERI <br />60.63 <br />Haul Fill fr Adj. Mat'l Storage Area to B -Seam Portal <br />Bench <br />TRUCKI <br />89.33 <br />Backfill and Regrade B -Seam Portal Bench <br />DOZER <br />38.70 <br />Pull Material Back onto Freeman Gulch Vent Shaft <br />Bench <br />EXCAVATE <br />2.31 <br />Push mat'l from Freeman Gulch Vent Shaft back to Cut <br />Slope <br />DOZER <br />0.48 <br />Regrade Freeman Gulch Vent Shaft Pad <br />DOZER <br />8.63 <br />Regrade Drill Pads from MRs and TRs <br />DOZER <br />106.90 <br />Regrade Material Storage Area from TR -29 <br />DOZER <br />0.48 <br />Backfill and Regrade New Prep Plant Bench <br />DOZER <br />36.99 <br />Replace Fill from Material Storage Area to Water Tank <br />Bench <br />SCRAPERI <br />1.51 <br />Regrade Borrow Area <br />DOZER <br />19.14 <br />Regrade Hubbard Creek Vent Shaft Pad <br />DOZER <br />1.89 <br />Regrade Upper Parking Lot Expansion Area <br />EXCAVATE <br />3.65 <br />Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk <br />Vent Shaft <br />TRUCKI <br />26.68 <br />Haul Rock to Vent Shafts for Disposal <br />TRUCKI <br />10.50 <br />Spread Uncompacted Refuse on Gob Pile #2 <br />DOZER <br />89.54 <br />Spread Uncompacted Refuse at Gob Pile #3 <br />DOZER <br />100.73 <br />Compact Material Hauled to Gob Pile #1 <br />COMPACT <br />13.38 <br />