and the final inspection and procedures of 3.03.2 have been satisfied. The total amount of <br />proposed releasable liability for Phase III bond release equals to 1.34% of the total applicable <br />bond, less than the maximum of 15 %. <br />Reclamation work which remains to be done at the site includes all remaining disturbances at the <br />Munger Canyon Mine site for Phase III. <br />Any person with a valid legal interest which might be adversely affected by this proposed <br />decision may request a formal public hearing before the Mined Land Reclamation Board in <br />accordance with Rule 3.03.2(6). Public notice of this proposed decision will be published twice <br />in the The Daily Sentinel as soon as possible. Requests for public hearing must be submitted to <br />the Division in writing within thirty days of the first publication in the The Daily Sentinel. If no <br />hearing is requested within those thirty days, the Division's decision will become final. <br />C -SL -10 <br />