Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2014 <br />Mine Name: CARBON JUNCTION MINE Permit Number: C- 1992-080 Permittee: OAKRIDGE ENERGY <br />Address: 4613 Old Jacksboro Highway, Wichita Falls, Texas 76301 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other datef, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of all of the areas reported <br />should be clearly depicted on a map included with the report. <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each <br />category below. Do not include acres that have achieved final, Phase III release. <br />Last Years <br />This Calendar <br />Cumulative <br />Land Status Category <br />Cumulative <br />Year <br />Cumulative Total' <br />Total <br />Total' <br />years <br />Acres Disturbed <br />62.00 <br />+ <br />0.0 <br />= <br />62.00 <br />Acres Backfilled & Graded <br />57.98 <br />+ <br />0.0 <br />= <br />57.98 <br />Acres to soiled <br />52.99 <br />+ <br />0.0 <br />= <br />52.99 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each <br />category below. Do not include acres that have achieved final, Phase III release. <br />* Include, if necessary, a description of any augmented seeding or cultural practices. <br />For the Entire Life of Mine, the total number of acres disturbed 77.31 acres and the total number of acres: <br />Phase I released: 74.94 ac. Phase II released: 74.94 ac. Phase III released: 15.31 ac. <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed not applicable <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities2 4.02 acres <br />Acreage in active mining areas3 0.00 acres <br />' exclude areas where Phase III release has been achieved <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and non -coal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />This <br />Cumulative <br /><10 <br />>10 <br />Cumulative <br />Calendar <br />Total' <br />years <br />years' <br />Total <br />Year <br />Acres <br />seeded' <br />52.99 <br />+ <br />0.0 <br />+ <br />52.99 <br />= <br />36.43 <br />+ <br />16.56 <br />* Include, if necessary, a description of any augmented seeding or cultural practices. <br />For the Entire Life of Mine, the total number of acres disturbed 77.31 acres and the total number of acres: <br />Phase I released: 74.94 ac. Phase II released: 74.94 ac. Phase III released: 15.31 ac. <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed not applicable <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities2 4.02 acres <br />Acreage in active mining areas3 0.00 acres <br />' exclude areas where Phase III release has been achieved <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of -hollow fills; valley fills; ventilation shafts and entryways; and non -coal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />