My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-27_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2015-01-27_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:55 PM
Creation date
1/29/2015 8:54:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/27/2015
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6(6) <br />(f)(iii)(C) <br />No mining related surface disturbance will occur within 100 feet of the <br />outside line of the WAPA transmission line right -of -way without a written <br />finding from the Authorized Officer and consultation with the right -of -way <br />holder. The WAPA transmission line right -of -way is 125 feet wide. <br />Regarding the Jess Barrow Homestead Cabin, the Environmental <br />Assessment DOI- BLM- CO -S050- 2013 -0010 dated September 2013 states <br />that subsidence associated with the Spruce Stomp lease is expected to be <br />minimal and would generally affect the area immediately overlying those <br />areas that are mined. Two historic properties are located within the projected <br />subsidence area; the remaining two significant sites would not be affected by <br />subsidence. It has been determined that, while two historic properties are <br />present within the projected subsidence area, it is not expected that they <br />would be adversely affected by subsidence within the LBA tract (Lane, <br />2013). These sites would be monitored after project activities commence to <br />ensure the continued integrity of both sites; if changes affecting the site are <br />observed, stabilization or stipulations would be conducted in consultation <br />with Tribes and Colorado SHPO. <br />The Operator protected its facilities from rockfall by constructing one berm at <br />the location shown on Map 15 -2 and in accordance with the design <br />presented in Volume VII, Tab 11. No other protection measures are <br />proposed. <br />Subsidence monitoring stations are not proposed to determine when the <br />potential for rockfalls might diminish. The Operator will assume rockfall <br />hazard continues for two years after an outcrop is affected by mining. <br />(f)(iv) A detailed description of the measures to be taken to mitigate the effects of <br />any material damage or diminution of value or foreseeable use of lands <br />which may occur. <br />PR -14 2.05-165- 03/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.