TR -04 <br />In June of 2014, a revision was submitted modifying the existing permit in order to address the <br />following issues: <br />1) Provide the as -built details for the 6 water wells that have been installed downstream of the <br />waste rock/tailings piles at the mine. This is provided in a revised Appendix 15. <br />2) Add some additional disturbed area near the old building in the low area north of the portal <br />to allow equipment storage there. The area is currently in the permit area, however it was <br />not in the disturbed area. There are no wetlands in the area to be used. All narrative for this <br />addition is submitted as a new Appendix, which is Appendix 16. New Mine Plan maps <br />included to show this use. <br />3) The use of the Atlas tailings /waste storage area will be needed concurrently with the <br />Revenue Pile, since we may need to store imported topsoil there, as well as provide an area <br />for wintertime placement of tailings since the avalanche path prevents activity on the <br />Revenue Pile during months when an avalanche could occur. For this reason, there is a bond <br />increase, which has been calculated. All of the narrative for this use is in the revised Mine <br />Plan pages of Appendix 16 and the revised bond calculation of Exhibit L. <br />As part of this Revision, Maps C -2, C -3, C -4 have been changed. <br />TR -05 <br />In December of 2014, a revision was submitted modifying the existing permit in order to address the <br />following issues: <br />1) Provide information on the thickener which is proposed as an outside structure near the mill <br />building. <br />2) Add a new concrete apron outside the filter building with a trough, sump and pump to <br />ensure that no tailings slurry from the 2 filter bays or other chemicals leave the filter <br />building area. <br />3) Revise the chemical list for the chemicals stored on site for the milling process. <br />Revenue Mine January 2015 TR 05 i -6 <br />